ITALY · ACTIVE SINCE 1977

IKOIMelting, heat treatment, continuous casting and chain

IKOI designs and builds machines for melting and for heat and chemical treatment of precious metals. Its management has worked in the field since 1977, and its machines run in semi-finished and chain lines worldwide.

IKOI Melting, heat treatment, continuous casting and chain
10product families
Italy · active since 1977origin
20 days to 3 monthsimport time
IKOI PRODUCT FAMILIES

IKOI product families

Pre-melting furnaces
Pre-melting furnacesPre-melting furnaces for alloying and preparing metal before continuous casting.
Tilting pre-melting furnaces, 15 to 300 kg
Tilting pre-melting furnaces, 15 to 300 kgTilting furnaces from 15 to 300 kg for high-volume melting.
Grain casting machines
Grain casting machinesUniform gold and silver grain for alloying and remelting.
Continuous casting
Continuous castingContinuous casting of wire, strip, tube and slab under controlled atmosphere.
Static annealing furnaces
Static annealing furnacesBatch annealing of parts, coils and sheet under protective atmosphere.
Continuous wire and strip annealing
Continuous wire and strip annealingContinuous annealing lines for wire and strip in chain making and rolling.
Belt furnaces
Belt furnacesBelt furnaces for continuous soldering and annealing of chain and parts.
Chain preparation tumblers
Chain preparation tumblersTumblers for chain preparation, powdering and finishing.
Chain accessories
Chain accessoriesGuide feeders and chain-end welders.
Gas generators and ammonia dissociators
Gas generators and ammonia dissociatorsProtective atmosphere for annealing and soldering furnaces; hydrogen and nitrogen generators.

Imported products: 20 days to 3 months lead time

All ZarTech products are imported directly from Italian and international manufacturers. Import time is 20 days to 3 months, depending on the machine.

Ask about stock and lead time
  1. InquiryTell us your need, capacity and space
  2. ProformaModel selection and proforma invoice
  3. OrderOrder placed with the maker
  4. Import20 days to 3 months by machine
  5. Install and trainInstallation, start-up and training
FREE CONSULTATION

Free phone consultation with a ZarTech engineer

Leave your number and a ZarTech specialist will call you back, or call us now.

Direct line to sales+98 920 371 9840
Call now
Call nowFree consultation